VALORIZACION OCTUBRE VICTOR ROMERO

Download VALORIZACION OCTUBRE VICTOR ROMERO

Post on 16-Aug-2014

206 views

Category:

Documents

6 download

Embed Size (px)

TRANSCRIPT

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

RESUMEN VALORIZACION N 001CORRESPONDIENTE A : 04 de Setiembre al 30 de Setiembre del 2007 : CONSTRUCCION DE PAVIMENTACION JIRON VICTOR ROMERO (I ETAPA). : BERNA CONTRATISTA S.A. : ING ABEL MUIZ PAUCARMAYTA CIP 35440 SUPERVISOR : Setiembre de 2007 MES VALORIZADO (K Setiembre) MONTO DEL PRESUPUESTO BASE S/. 109,858.17 (incl. I.G.V.) : Junio del 2007 FECHA PRESUPUESTO BASE (K Junio) MONTO DEL PRESUP. CONTRATADOS/. 107,661.01 (incl. I.G.V.) 0.98000003 FACTOR DE RELACION (F.R.)OBRA EJECUTA

MONTO CONTRATADO

S/. 107,661.01VALORIZACION REAJUSTE RESUMEN TOTAL A LA FECHA

MONTO DE VALORIZACION MENSUALES AMORTIZACIONES INCLUYE REAJUSTE E IGV (ADELANTO DIRECTO 20%, MATERIALES 40%) INCLUYE IGV MONTO N DE VALOR. O REAJ. (S/.)

RETENCION POR FIEL CUMPLIMIENTO 10% INC. IGV

NETO A PAGAR AUTORIZADO INC. IGV

SALDO POR COBRAR

01 01

S/. 40,490.37 S/. 323.92 S/. 40,814.29

S/. 0.00 S/. 0.00 S/. 0.00

S/. 0.00 S/. 0.00 S/. 0.00

S/. 40,490.37 S/. 323.92 S/. 40,814.29

S/. 67,170.64 S/. 0.00 S/. 67,170.64

MONTOS ACUMULADOSVALORIZACION INCLUYE REAJUSTE

AMORTIZACION S/. 0.00

RETENCION S/. 0.00

SALDO POR COBRAR S/. 67,170.64

MONTOS ACUMULADO

S/. 40,814.29

MONTOS ACUMULADOS VALORIZACION INCLUYE REAJUSTE AMORTIZACION RETENCION SALDO ACUMULADO A PAGAR

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

RESUMEN VALORIZACION N 001 Y REAJUSTE DE LA OBRA PRINCIPALCORRESPONDIENTE A SETIEMBRE : 04 de Setiembre al 30 de Setiembre del 2007 OBRA : CONSTRUCCION DE PAVIMENTACION JIRON VICTOR ROMERO (I ETAPA). EJECUTA : BERNA CONTRATISTA S.A. SUPERVISOR : ING ABEL MUIZ PAUCARMAYTA CIP 35440 MES VALORIZADO : Setiembre de 2007 (K Setiembre) MONTO DEL PRESUPUESTO BASE S/. 109,858.17 (incl. I.G.V.) FECHA PRESUPUESTO BASE : Junio del 2007 (K Junio) MONTO DEL PRESUP. CONTRATADO S/. 107,661.01 (incl. I.G.V.) FACTOR DE RELACION (F.R.) 0.98000

DESCRIPCIONVALORIZACION Formula 01 : Formula 02 : COSTO DIRECTO TOTAL GASTOS GENERALES UTILIDADES COSTO DE OBRA VALORIZADO Factor de relacin

MONTO28,932.18 0.00 28,932.18 2,894.52 2,893.22 34,719.92 34,025.52272.20 272.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10.0045% 10.00% 0.98000

VALORIZACION DEL MES SIN IGVReajustes del presente mes - (mes de indices unificados) Reajuste K mes: ( K Set.-1) Reajuste K mes: ( K Set.-1) Reintegro Reintegro K mes: V1f1x( K Set,.-1) Reintegro K mes: V1f2x( K Set,.-1) DEDUCCION DE REAJUSTES QUE NO CORRESPONDEN ( - ) Por adelanto directo Por adelanto de materiales

VmesR

Re

VALORIZACION BRUTA (V.B.)AMORTIZACION DE ADELANTOS Amortizacin Adelantos Directos (20%) Amortizacin de Adelantos para materiales (40%)

VB = Vmes + R - D(-) (-)

34,297.720.00 0.00 0.00

VALORIZACION NETA (V.N.)MONTO A CANCELAR IGV 19%(VN)

VN = VB - A

34,297.726,516.57

A FACTURAR POR EL CONTRATISTA

VN+IGV

40,814.29

AVANCE FINANCIERO VALORIZADO 41,316.71 34,719.92 6,596.78

AVANCE REPORTADO POR CONTRATISTA 40,814.30 34,297.72 6,516.57

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

METRADO CORRESPONDIENTES A SETIEMBRE 2007CORRESPONDIENTE A SETIEMBRE : 04 de Setiembre al 30 de Setiembre del 2007OBRA : FINANCIA : EJECUTA : MOD. EJEC : SUPERVISOR :

CONSTRUCCION DE PAVIMENTACION JIRON VICTOR ROMERO (I ETAPA). MUNICIPALIDAD PROVINCIAL DE PASCO. BERNA CONTRATISTA S.A. CONTRATO A SUMA ALZADA. ING ABEL MUIZ PAUCARMAYTA CIP 35440 METRADOS

ITEM

DESCRIPCION PARTIDA

UNIDAD

CANTIDAD

01.00.00 01 01.01 01.02 01.03 1.04 1.05 02.00.00 2.01 2.02 03.00.00 3.01 3.02 3.03 3.04 3.05 03.05.01 03.05.02

Pavimentacin OBRAS PROVISIONALES CARTEL DE LA IDENTIFICACION DE LA OBRA DE 3.60X2.40 ALQUILER DE ALMACEN TRANSPORTE DE EQUIPO Y MAQUINARIA TRANSPORTE DE MATERIALES AGUA PARA LA OBRA TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO MOVIMIENTO DE TIERRAS EXCAVACIN A NIVEL DE SUBRASANTE PERFILADO Y COMPACTADO EN ZONA DE CORTE CONFORMACION DE TERRAPLENES RENDIMIENTO=920 M3/DA ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO) REND.=250M3/DA CONFORMACION DE BASE BASE GRANULAR E=0.20 M REND=1760 M2/DA FACT. COMPACT=1.20 SUB-BASE E=0.20 M REND=1940 M2/DA FACTOR COMPACT=1.20 M2 M2 102.65 102.65 M3 M2 M3 M3 0.00 0.00 0.00 0.00 M2 M2 60.83 60.83 UND mes est GLB est 0.00 0.00 0.00 0.00 0.00

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

VALORIZACION DE AVANCE DE OBRA N 001CORRESPONDIENTE A SETIEMBRE : 04 de Setiembre al 30 de Setiembre del 2007OBRA : FINANCIA : EJECUTA : MOD. EJEC : SUPERVISOR :

CONSTRUCCION DE PAVIMENTACION JIRON VICTOR ROMERO (I ETAPA). MUNICIPALIDAD PROVINCIAL DE PASCO. BERNA CONTRATISTA S.A. CONTRATO A SUMA ALZADA. ING ABEL MUIZ PAUCARMAYTA CIP 35440 SEGN EXPEDIENTE TECNICO

VALOR REFERENCIAL : S/. 109,858.17 MONTO CONTRATADO : S/. 107,661.01 MES DE VALORIZACION : : SETIEMBRE de 2007 PRESUPUESTO BASE : : JUNIO de 2007 PLAZO DE EJECUCION : : 60 dias Calendarios

AVANCESAVANCE ANTERIOR % MET VALORIZADO S/. % AVANCE ACTUAL MET VALORIZADO S/. % AVANCE ACUMULADO MET VALORIZADO S/. %

SALDOMET VALORIZADO S/.

ITEM

DESCRIPCION PARTIDA

UNIDAD

METRADO

PRECIO UNITARIO

SUBTOTAL

01.00.00 01.00.00 01.01 01.02 01.03 01.04 01.05 02.00.00 02.01 02.02 03.00.00 03.01 03.02 03.03 03.04 03.05 03.05.01 03.05.02 04.00.00 4.01.00 04.01.01 04.01.02 04.01.03 04.01.04 04.01.05 04.01.06 4.02 04.02.01 04.02.02 04.02.03 4.03 04.03.01

PAVIMENTACION OBRAS PROVISIONALES CARTEL DE LA IDENTIFICACION DE LA OBRA DE 3.60X2.40 ALQUILER DE ALMACEN TRANSPORTE DE EQUIPO Y MAQUINARIA TRANSPORTE DE MATERIALES AGUA PARA LA OBRA TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO MOVIMIENTO DE TIERRAS EXCAVACIN A NIVEL DE SUBRASANTE PERFILADO Y COMPACTADO EN ZONA DE CORTE CONFORMACION DE TERRAPLENES RENDIMIENTO=920 M3/DA ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO) REND.=250M3/DA CONFORMACION DE BASE BASE GRANULAR E=0.20 M REND=1760 M2/DA FACT. COMPACT=1.20 SUB-BASE E=0.20 M REND=1940 M2/DA FACTOR COMPACT=1.20 OBRAS DE CONCRETO SIMPLE PAVIMENTO CONCRETO F'C=210 KG/CM2 RENDIMIENTO =16 M3/DA ACERO FY=4200 KG/CM2 EN PAVIMENTO TUBERIA PVC SEL- 1" EN PAVIMENTO ENCOFRADO Y DESENCOFRADO EN PAVIMENTO CURADO DE CONCRETO DURANTE 8 DAS RELLENO DE JUNTAS DE DILATACION CUNETAS CONCRETO F'C=175 KG/CM2 EN CUNETA ENCOFRADO Y DESENCOFRADO DE CUNETAS ACABADO DE CUNETA 1:5 E=1.50 CM CONTROL DE CALIDAD ENSAYO A LA RESISTENCIA DEL CONCRETO UND 5.00 312.00 1,560.00 40.00 2.00 624.00 40.00 2.00 624.00 60.00 3.00 936.00 M3 M2 M2 30.19 305.21 254.90 234.18 16.36 9.97 7,069.89 4,993.24 2,541.35 100.00 100.00 100.00 30.19 305.21 254.90 7,069.89 4,993.24 2,541.35 M3 KG ML M2 M2 ML 125.46 1,566.22 1,017.03 112.81 836.40 112.81 252.49 4.06 5.95 13.44 1.14 2.74 31,677.40 6,358.85 6,051.33 1,516.17 953.50 309.10 71.63 26.70 30.09 75.63 89.87 418.20 306.00 85.32 22,690.47 1,697.89 1,820.70 1,146.70 71.63 26.70 30.09 75.63 89.87 418.20 306.00 85.32 22,690.47 1,697.89 1,820.70 1,146.70 28.37 73.30 69.91 24.37 100.00 100.00 35.59 1,148.02 711.03 27.49 836.40 112.81 8,986.93 4,660.96 4,230.63 369.47 953.50 309.10 M2 M2 836.40 836.40 4.19 4.62 3,504.52 3,864.17 75.00 75.00 627.30 627.30 2,628.39 2,898.13 12.27 12.27 102.65 102.65 430.11 474.25 87.27 87.27 729.95 729.95 3,058.49 3,372.37 12.73 12.73 106.45 106.45 446.02 491.79 M3 M2 M3 M3 250.92 836.40 167.28 313.65 2.13 1.06 2.34 1.64 534.46 886.58 391.44 514.39 100.00 100.00 100.00 100.00 250.92 836.40 167.28 313.65 534.46 886.58 391.44 514.39 100.00 100.00 100.00 100.00 250.92 836.40 167.28 313.65 534.46 886.58 391.44 514.39 M2 M2 836.40 836.40 0.13 0.66 108.73 552.02 80.00 80.00 669.12 669.12 86.99 441.62 7.27 7.27 60.83 60.83 7.91 40.15 87.27 87.27 729.95 729.95 94.89 481.77 12.73 12.73 106.45 106.45 13.84 70.26 UND Mes Est GLB Est 1.00 2.00 1.00 1.00 1.00 356.47 100.00 1,500.00 1,250.00 235.00 356.47 200.00 1,500.00 1,250.00 235.00 100.00 50.00 80.00 80.00 100.00 1.00 1.00 0.80 0.80 1.00 356.47 100.00 1,200.00 1,000.00 235.00 100.00 50.00 80.00 80.00 100.00 1.00 1.00 0.80 0.80 1.00 356.47 100.00 1,200.00 1,000.00 235.00 50.00 20.00 20.00 1.00 0.20 0.20 100.00 300.00 250.00 -

COSTO DIRECTOGASTOS GENERALES 10.0045% UTILIDAD 10.00% SUBTOTAL FACTOR DE RELACION 0.98000

76,928.61 7,696.32 7,692.86 92,317.79 90,471.44 90,471.44

14.65%

11,273.45 1,127.85 1,127.35 13,528.65 13,258.08 13,258.08

37.61%

28,932.18 2,894.52 2,893.22 34,719.92 34,025.52 34,025.52

52.26%

40,205.63 4,022.37 4,020.56 48,248.56

47.74%

36,722.97 3,673.95 3,672.30 44,069.22 43,187.83 43,187.83

52.26

47,283.59 47,283.59

TOTAL VALORIZADO MENSUAL

76,928.60

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

CUADRO CONTROL DE VALORIZACIONES - Setiembre 2007ADELANTOS Efectivo 0.00 IGV (A. E.) 0.00 0.00 Materiales 0.00 IGV (A.M.) Valorizacion Bruta (con F.R.) 34,025.52 VALORIZACION (Sin IGV) Reajuste Valoriz. Actual 272.20 Regulariz. Reajustada Val. Ant. Total Valoriz. Bruta Reajustada 34,297.72 AMORTIZACIONES Adelanto Efectivo (Sin IGV) 0.00 0.00 Adelanto Materiales (Sin IGV) 0.00 0.00 Adelanto Efectivo 0.00 DEDUCCIONES Reg. Reaj. Ade. Efec. (Sin IGV) Total Deducc. (Sin IGV) 0.00 Adelanto Materiales OTROS Material en Cancha (Sin IGV) Monto Facturable (Sin IGV) 34,297.72 34,297.72 0.00 0.00 0.00 0.00 Valoriz. Bruta RETENCIONES (Sin IGV) Fondo de Garantia Reaj. Val. Actual Reg. Reaj. Val. Ant. Retencin por Atrazo Total Retencin 0.00 Monto Liquido a Pagar (Sin IGV) 34,297.72 34,297.72 I.G.V. Del Monto Facturable (19.00 %) 6,516.57 6,516.57 COMPROBANTE DE PAGO Monto a Facturar 40,814.29 40,814.29

Valorizacin N Mes

Reajuste que no Corresponde

01 Set-07 02 Oct-07

0.00 0.00 0.00 34,025.52

272.20

0.00

0.00

Totales 0.00 Total Adelanto (Inc. IGV)

0.00 34,297.72 Saldo Amortizar (Sin IGV)

PORCENTAJE DE ADELANTO EN EFECTIVO

20.00%

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

CONTROL DE AMORTIZACIONES REALES - Setiembre 2007OBRA EJECUTA SUPERVISOR MES VALORIZADO MONTO DEL PRESUPUESTO BASE FECHA PRESUPUESTO BASE MONTO DEL PRESUP. CONTRATADO FACTOR DE RELACION (F.R.) : CONSTRUCCION DE PAVIMENTACION JIRON VICTOR ROMERO (I ETAPA). : BERNA CONTRATISTA S.A. : ING ABEL MUIZ PAUCARMAYTA CIP 35440 : Setiembre de 2007 S/. 109,858.17 : Junio del 2007 S/. 107,661.01 0.98000

A) AMORTIZACION DEL ADELANTO DIRECTOValorizacion N Fecha Adelanto en Efectivo S/. Valorizacin de Obra Reajustado con F.R. AMORTIZACION DEL ADELANTO DIRECTO AMORTIZACION AMORTIZACION MES (S/.) ACUMULADA

01 02 03

Set-07 Oct-07 Nov-07

0.00

34,025.52 34,025.52

0.00 0.00 0.00

-

0.00 AMORTIZACION ACUMULADA - ADELANTO DIRECTO AMORTIZACION ACUMULADA ANTERIOR AMORTIZACION DEL MES

B) AMORTIZACION DEL ADELANTO DE MATERIALESValorizacion N Fecha Adelanto de Materiales S/. Valorizacin de Obra Reajustado con F.R. AMORTIZACION DEL ADELANTO DE MATERIALES AMORTIZACION AMORTIZACION MES (S/.) ACUMULADA

01 02 03

Set-07 Oct-07 Nov-07

0.00

34,025.52 34,025.52

0.00 0.00 0.00

-

0.00

AMORTIZACION ACUMULADA - ADELANTO MATERIALES AMORTIZACION ACUMULADA ANTERIOR AMORTIZACION DEL MES

PORCENTAJE DE ADELANTO EN EFECTIVO PORCENTAJE DE ADELANTO DE MATERIALES adelanto con igv adelanto sin igv

0.00% 0.00% 0.00 0.00 0.00

EALES - Setiembre 2007

IMENTACION JIRON VICTOR ROMERO (I ETAPA).

(K Setiembre) (incl. I.G.V.) (K Junio) (incl. I.G.V.)

AMORTIZACION DEL ADELANTO DIRECTO SALDO A AMORTIZAR

0.00 monto de adelanto incluido IGV0.00 0.00 0.00

AMORTIZACION DEL ADELANTO DE MATERIALES SALDO A AMORTIZAR

0.00 monto de adelanto incluido IGV0.00 0.00 0.00

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

AMORTIZACION DE ADELANTO DIRECTO VALORIZACION N 01CORRESPONDIENTE A SETIEMBRE : 04 de Setiembre al 30 de Setiembre del 2007 FORMULA UTILIZADAA = (Adelanto Directo / Monto Contratado) X (Valorizacin Mensual)

A =(AD/MC) x V

SIMBOLO % MC V ADNORMA: DS N 013-2001-PCM NO INCLUYE IGV

DESCRIPCION% Adelanto Monto Contratado sin IGV Valorizacin Ejecutada sin IGV Adelanto Directo sin IGV

DATOS0.00% S/. 90,471.44 34,025.52 S/. 0.00

MONTO

0.00

DEDUCCION DE REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DIRECTOFORMULA UTILIZADA D = (A.D./ MC) x (V)(K/Ka-1)D = (Adelanto Directo / Monto Contratado) X (Valorizacion Mensual) (Coeficiente Reajuste de la Valorizacin/Coeficiente de Reajuste del mes en que se otorgo el adelanto -1)

SIMBOLO % MC V AD K KaNORMA: DS N 06-86-VC NO INCLUYE IGV

DESCRIPCION % Adelanto Monto Contratado sin IGV Valorizacin Ejecutada sin IGV Adelanto Directo sin IGVCoeficiente de Reajuste (Setiembre. 2006) Coeficiente de Reajuste (Setiembre. 2006)

DATOS 20.00% S/. 90,471.44 S/. 34,025.52 S/. 0.00 1.008 mes valorizado 1.008 mes de adelanto

MONTO

0.00

SIMBOLO % MC V AD K Ka

DESCRIPCION % Adelanto Monto Contratado sin IGV Valorizacin Ejecutada sin IGV Adelanto Directo sin IGV Coeficiente de Reajuste (nov. 2006) Coeficiente de Reajuste (oct. 2006)

DATOS 20.00% S/. 221,384.11 34,025.52 S/. 44,276.82 1.01 1.01

MONTO

0.00

DEDUCCION DE REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALESFORMULA UTILIZADA D = A * (Imr-Ima)/Imo

D = (Adelanto Directo / Monto Contratado) X (Valorizacion Mensual) (Coeficiente Reajuste de la Valorizacin/Coeficiente de Reajuste del mes en que se otorgo el adelanto -1)

SIMBOLO

%Imo

DESCRIPCION % AdelantoIndice a la fecha del presupuesto base del elemento representativo dentro del cual se encuentra el material para los cuales se otrogo el adelanto

DATOS

MONTO

40.00%

S/. 0.00

Ima

Indice del elemento a la fecha del efectiva de adelanto

S/. 0.00ImrIndice del mismo elemento representativo a la fecha del reajuste Es el monto del adelanto utilizado en la valorizacion que se reajusta. Este monto se obtiene multiplicando el coeficiente de incidencia del elemento correpondiente por el monto bruto de la valorizacion hasta completar el total del adelanto otorgado afectado por la expresion Imo/Ima

S/. 0.00

A

0.000 #DIV/0!

NORMA: DS N 06-86-VC NO INCLUYE IGV

HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO Gerencia de Desarrollo Urbano y Rural Sub Gerencia de Estudios, Obras - Maquinarias y Equipos Pesados

CALCULO DE REINTEGROSFORM: UNICA OBRA EJECUTA SUPERVISOR MES VALORIZADO MONTO DEL PRESUPUESTO BASE FECHA PRESUPUESTO BASE MONTO...