DATOS GENERALES DE OBRA -2 VALORIZACION

OBRA:MEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJA

ENTIDAD:MUNICIPALIDAD DE CHEPEN

UBICACIN:DIST. : CHEPEN, PROV. : CHEPEN, DPTO : LA LIBERTAD

SISTEMA DE CONTRATACION: SUMA ALZADA

VALOR REFERENCIAL:S/40,186.0833769.8151260504

FECHA DE VALOR REFERENCIAL:30.Oct.11

MONTO CONTRATADO:S/36,167.47

FACTOR DE RELACION0.900000.040.04

FECHA FIRMA DE CONTRATO:19.Apr.12

MONTO ADELANTO PARA MATERIALES (2):0.00.00%

FECHA ENTREGA DEL TERRENO:15.Apr.12

FECHA DE INICIO CONTRACTUAL DE OBRA:01.May.12

PLAZO DE EJECUCION :60 Dias Calendario

FECHA DE TERMINO CONTRACTUAL DE OBRA:29.Jun.12

ADELANTO DIRECTO ( 20%MC) - MARZO:S/7,233.49

ADELANTO MAXIMO PARA COMPRA DE TUBERIA DE PVC- DESDE JUNIO:S/3,052.66

VALORIZACION DE OBRA No. 02:31/06/2012

AMPLIACION DE PLAZO:

NUEVA FECHA DE TERMINO PREVISTO:

ACTA DE RECEPCION DE OBRA:

Pag. 1

RVM(PRINT)

RESUMEN VALORIZACION PRINCIPAL N 02VALORIZACION N 02- JUNIO 2012

OBRA:MEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJA

ENTIDAD:MUNICIPALIDAD DE CHEPEN

UBICACIN:DIST. : CHEPEN, PROV. : CHEPEN, DPTO : LA LIBERTAD

1. VALORIZACION DEL MES (SIN IGV 18%) ( V )Ver Pagina 214,230.21

2. REINTEGROS ( R )Ver Pagina 9-42.69

3. DEDUCCION DEL MONTO (D)..............S/.17.233.1 ADELANTO DIRECTOVer Pagina 917.233.2 ADELANTO DE MATERIALVer Pagina 80.004. VALORIZACION BRUTA ( VB )..............S/.14,204.75

5. AMORTIZACIONES (SIN IGV 18%)S/.5,898.70

6.1 ADELANTO DIRECTOVer Pagina 9..............S/.2,846.04 6.2 ADELANTO DE MATERIALVer Pagina 8S/.3,052.66

6. VALORIZACION NETA ( 4 - 5 ) ( VN )..............S/.8,306.05

7. IGV(18%)..............S/.1,495.09

8. MONTO A PAGAR..............S/.9,801.14

Pag. 10

* MONTOS A FACTURAR Y A RECIBIR POR EL CONTRATISTA POR CONTRATO PRINCIPAL

PARCIALIGVMONTO 18%TOTALFORMULAS VARIAS8,331.511,499.679,831.18OTROS0.000.000.009831.18

* MONTOS A FACTURAR Y A RECIBIR POR EL CONTRATISTA POR REAJUSTE

PARCIALIGVMONTO 18%TOTALFORMULAS VARIASERROR:#REF!ERROR:#REF!ERROR:#REF!OTROS 0.000.000.00ERROR:#REF!

VALORIZAC(PRINT)VALORIZACION N 02- JUNIO 2012

OBRA:MEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJAENTIDAD:MUNICIPALIDAD DE CHEPENPRESUPUESTO REFERENCIAL (IGV 18%):40,186.08PRESUPUESTO CONTRATADO SIN IGV:36,167.47PRESUPUESTO RESULTANTE SIN IGV:ERROR:#REF!ERROR:#REF!FACTOR DE RELACION:0.90PLAZO DE EJECUCION :60 Dias Calendario

PRESUPUESTOVALORIZ. ANTERIORVALORIZ. ACTUALACUMULADOSALDO POR VALORIZARITEMDESCRIPCIONUNDMETRADOP.UNIT.PRESUP.METRADOVALORIZ.%METRADOVALORIZ.%METRADOVALORIZ.%METRADOVALORIZ.%S/.S/.S/.S/.S/.S/.RELANTEO01OBRAS PRELIMINARES01.01CARTEL DE OBRAglb1.00400.00400.001.00400.00100.000.000.000.001.00400.001000.000.000.00ERROR:#REF!1.001.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALES A OBRAglb1.00500.00500.001.00500.00100.000.000.000.001.00500.001000.000.000.00ERROR:#REF!01.03TRAZO Y REPLANTEOm1,477.300.52768.201,255.00652.6084.95222.30115.6015.051,477.30768.201000.000.000.00ERROR:#REF!244.502MOVIMIENTO DE TIERRAS0.00ERROR:#REF!337.702.01EXCAVACION DE ZANJAS PARA TUBERIA DE AGUAm1,462.304.336,331.76750.503,249.6751.32711.803,082.0948.681,462.306,331.761000.000.000.00ERROR:#REF!69.602.02REFINE Y NIVELACION EN TERRENO NORMALm1,462.300.931,359.94750.50697.9751.32711.80661.9748.681,462.301,359.941000.000.000.00ERROR:#REF!1033.51146.1702.03RELLENO DE ZANJA COMPACTADO MATERIAL SELECCIONADOm1,462.304.276,244.02750.503,204.6451.32711.803,039.3948.681,462.306,244.021000.000.000.00ERROR:#REF!36.9002.04ELIMINACION DE DESMONTEm3416.939.103,794.06220.602,007.4652.91196.331,786.6047.09416.933,794.061000.000.000.00ERROR:#REF!17.3203SUMINISTRO E INSTALACION DE TUBERIA0.00ERROR:#REF!252.95149.5303.01TUBERIA DE PVC SAL 2 1/2"m1,477.306.179,114.94750.504,630.5950.80726.804,484.3649.201,477.309,114.941000.000.000.00ERROR:#REF!ERROR:#REF!03.02PRUEBA HIDRAULICA + DESINFECCION TUBERIA 2 1/2"m1,477.301.412,082.99750.501,058.2150.80726.801,024.7949.201,477.302,082.991000.000.000.00ERROR:#REF!107.220.6303.03EMPALME DE TUBERIA A TANQUE ELEVADOu1.0071.6371.631.0071.63100.000.000.000.001.0071.631000.000.000.0004VALVULAS Y ACCESORIOS0.00ERROR:#REF!18.504.01VALVULA DE COMPUERTA 2 1/2"u4.00150.00600.002.00300.0050.002.00300.0050.004.00600.001000.000.000.0004.02CODO DE PVC SAL SP DE 2 1/2"X45u2.008.5417.081.008.5450.001.008.5450.002.0017.081000.000.000.00ERROR:#REF!153.030.4704.03TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 2 1/2"u1.007.707.701.007.70100.000.000.000.001.007.701000.000.000.0005COLOCACION DE VALVULA Y ACCESORIO0.00ERROR:#REF!237.8204.405.01COLOCACION DE VALVULASu4.0035.82143.282.0071.6450.002.0071.6450.004.00143.281000.000.000.0005.02COLOCACION DE ACCESORIOSu3.0032.5897.741.0032.5833.332.0065.1666.673.0097.741000.000.000.00ERROR:#REF!281.0161.67ERROR:#REF!52.031,533.3416,893.2114,640.1431,533.340.00FORM. N1.00ESTRUCTURASS/.31,533.3416,893.2114,640.1431,533.340.00TOTAL COSTO DIRECTO:S/.31,533.3416,893.2114,640.1431,533.340.00GASTOS GENERALES Y UTILIDADES (8%)S/.2,522.661,351.461,171.212,522.670.00SUB TOTAL PRECIOS DEL VALOR REFERENCIALS/.34,056.0018,244.6715,811.3534,056.010.00SUB TOTAL PRECIOS DEL CONTRATO0.9030,650.4016,420.2014,230.2130,650.410.00

AVANCE REAL =VALORIZACION ACTUAL / PRESUPUESTO CONTRATADO

AVANCE REAL =46.43%

AVANCE REAL EN %46.43%AVANCE PROGRAMADO EN %43.15%ESTADO: ADELANTO / ATRAZO3.28%ADELANTADO

Pag.2

Pag. 5

177599.48171190.57348790.0543,463.47

140023.54550607.88190631.431,199.9837575.93100808.26138384.1927,087.63011525.8111525.810.0008248.628248.620.0000015,175.86177599.48171190.57348790.0543,463.4717759.9517119.0634879.0054,346.358879.978559.5317439.52,173.17204239.4196869.16401108.55549,982.99204239.4196869.16401108.5649,982.9936763.09235436.44972199.5418,996.94241,002.49232,305.61473,308.1058,979.930.45276707050.4364280.88919546250.110.45276707050.88919507050.88919546250.46910.48410.95320.050.46910.95320.95320.96518241420.93285257080.932852982

ESTADO DE LA OBRA RESPECTO AL CRONOGRAMA...VER PAGINA 6(14230.21 / 30650.40) X 100

CAO_ACTUALIZADO_INICIO_CTTOCALENDARIO DE AVANCE DE OBRA PROGRAMADO

ObraMEJORAMIENTO DE REDES DE AGUA POTABLE EN EL AA.HH. MORANA BAJAERROR:#REF! ERROR:#REF!DepartamentoLA LIBERTADProv.CHEPENDistritoCHEPENERROR:#REF!Plazo60 DIAS CALE+NDARIO ERROR:#REF! ERROR:#REF!

Partidas TotalMes 01 - MAYO 2012 Mes 02 - JUNIO 2012 S/.%%01 ESTRUCTURAS 31,533.3417,928.0956.85%13,605.2543.15%36263.3401 Obras Preliminares 1,668.201,668.20100.00%0.00.00%1,668.2002 Movimiento de Tierras 17,729.7810,637.8760.00%7,091.9140.00%17,729.7803 Suministro e Instalacion de Tuberia 11,269.565,071.3045.00%6,198.2655.00%11,269.5604 Valvulas Y Accesorios 624.78406.1165.00%218.6735.00%624.7805 Colocacion de Valvula y Accesorio241.02144.6160.00%96.4140.00%Costo Directo 31,533.3417,928.0913,605.2536,263.34Gastos Generales 4% 1,261.33717.12544.21Utilidad 4% 1,261.33717.12544.21Sub Total Precios del Valor Referencial 34,056.0019,362.330.014,693.670.0Sub Total Precios del Contrato (0.90) 30,650.4017,426.100.013,224.310.0 PORCENTAJE DE AVANCE PARCIAL DE OBRA100.00%56.85%ERROR:#REF!43.15%ERROR:#REF!PORCENTAJE DE AVANCE ACUMULADO DE OBRA56.85%ERROR:#REF!100.00%ERROR:#REF!

21867.30%0.00%0.00%0.00%9640.80%MAYO26.90%56.85%3.00%ERROR:#REF!MAYOJUNIOTOTALJUNIO43.15%100.00%100.00%16,420.2014,230.2130,650.41 JULIOERROR:#REF!ERROR:#REF!60.00%PORCENTAJE DE AVANCE PARCIAL DE OBRA53.57%46.43%100.00%45.00%PORCENTAJE DE AVANCE ACUMULADO DE OBRA53.57%100.00%Pag. 3

CALENDARIO DE AVANCE DE OBRA REAL

Kr

K =0.266Jr+0.263DVTr+0.329MMHr+0.142GGrJoDVToMMHoGGo

DESC.SIMB.COD.COEF. INC.PORCENT.IND. BASEI U rI U aKV2Kad%Oct. 11Apr-12Mar-12Apr-12Mar-12MANO DE OBRAJ0.2660.2660.26647100.00%448.29448.25448.25

DLARDTV300.26310.61%361.12357.90354.390.2600.256TUBERIA DE PVC7282.69%351.77346.99340.98VALVULA DE BRONCE NACIONAL776.70%276.18275.39274.69HERRAMIENTAS MANUALESMMH370.3294.11%278.94290.26286.860.3260.325Maquinaria y Equipo Nacional4817.70%330.64329.22327.49Maquinaria y Equipo Importado4978.19%238.25234.59234.24GASTOS GENERALESGG390.142100.00%0.1450.144368.88377.30375.16

1.0000.9970.991K

Kr : Coeficiente Reajuste Valorizacion

Pag. 4

MANO DE OBRA

KV =0.266

DOLAR -TUBERIA DE PVC - VALVULA DE BRONCE NACIONAL KV = =0.260

HERRAMIENTAS MANUALES - MAQUINARIA Y EQUIPO NACIONAL - MAQUINARIA Y EQUIPO IMPORTADOKV0.326 =

47448.25

GASTOS GENERALES30357.972346.9977275.3937290.2648329.22KV0.14549234.59 =39377.30

Pag. 5MANO DE OBRAKV =0.266DOLAR -TUBERIA DE PVC - VALVULA DE BRONCE NACIONAL KV = =0.256

HERRAMIENTAS MANUALES - MAQUINARIA Y EQUIPO NACIONAL - MAQUINARIA Y EQUIPO IMPORTADOKV0.325 =

GASTOS GENERALESKV0.144 =

Pag. 6

CALCULO DE LOS COEFICIENTES DE REINTEGROCALCULO DEL K DE LA VALORIZACION 2 (KV2)0.266 x 100% x (448.25/448.29) =0.263 x (4.11% x 290.26) + (17.70% x 329.22) + (78.19% x 234.59)(4.11% x 278.94) + (17.70% x 330.64) + (78.19% x 238.25)0.142 x 100% x (377.30/368.88) =CALCULO DEL K DEL ADELANTO (Kad)ver pagina 9ver pagina 100.329 x (10.61% x 361.12) + (82.69% x 351.77) + (6.70% x 276.18)(10.61% x 357.90) + (82.69% x 346.99) + (6.70% x 275.39)0.266 x 100% x (448.25/448.29) =0.263 x (10.61% x 286.86) + (17.70% x 327.49) + (78.19% x 234.24)(10.61% x 278.94) + (17.70% x 330.64) + (78.19% x 238.25)0.142 x 100% x (375.16/368.88) =0.329 x (4.11% x 361.12) + (82.69% x 351.77) + (6.70% x 276.18)(4.11% x 354.39) + (82.69% x 340.98) + (6.70% x 274.69)

Ad- Mat

MONTO MAXIMO PARA LA COMPRA DE TUBERIA DE PVC

COEFICIENTE DE INCIDENCIA PORCENTAJE DE PARTICIPACIONSALDO POR VALORIZARINDICE UNIFICADO RECIENTE (Ima)INDICE UNIFICADO DE ORIGEN (IUo)MONTO MAXIMO PARA COMPRA DE MATERIAL

0.26382.69%14,230.20346.99351.773,052.66

SALDO POR VALORIZAR=14,230.20MONTO MAXIMO PARA COMPRA DE MATERIAL=3,052.66DEDUCCION PARA LA PARA LA COMPRA DE TUBERIA DE PVC

COEFICIENTE DE INCIDENCIA PORCENTAJE DE PARTICIPACIONvINDICE UNIFICADO RECIENTE (Ima)INDICE UNIFICADO DE ORIGEN (IUo)INDICE UNIFICADO DEL ADELANTO MATERIAL (IUA)DEDUCCION DE ADELANTO DE MATERIAL

0.26382.69%14,230.21346.99351.77346.990.00

=0.00HEMOS UTILIZADO EL 100% DEL INSUMO TUBERIA DE PVC EN EL MES DE JUNIOAMORTIZACION DEL ADELANTO DEL MATERIAL =3,052.66

Pag.8

Clculo de Adelanto de Materiales So = (Monto Contratado - Monto del Mes Valorizado)So = 30 650.40 - 16 420.20Mmax = (Coeficiente de Incidencia x Porcentaje de Participacion x So x (IMa/ IUo))Mmax = (0,263 x 82.69% x 14 230.20 x ( 346.99/ 351.77)Clculo de Deduccion de Materiales Dmat = Coeficiente de Incidencia x Porcentaje de Participacion x V x ((IMa - IUA)/ IUo)Dmat = 0,263 x 82.69% x 14 230.21 x (( 346.99 - 346.99 ) / 351.77 )Amortizacion de Adelanto de MaterialAmat = 100% (3 052.66)

R-D-AVREINTEGROSDEDUCCION DEL MONTO (Adelanto Directo)AMORTIZACIONESR=V(K-1)D=(Ad/MC) V ((K/Ka)-1)A=(Ad/MC) V KK-1RMCAdKa(K/Ka)-1DAVALORIZACION 114,230.210.997-0.00300-42.6906336167.4727233.49440.9910.0060517.23133400612846.042

V = Monto del Avance de ObraMC = Monto ContratadoD = Deduccion del Monto K = Coeficiente de ReintegroAd = AdelantoA = Amortizacion R = ReintegrosKa= Coeficiente de Reintegro del mes del AdelantoCALCULO DE REINTEGROSFORMULAR = V(K-1)

CALCULO DE DEDUCCION DEL MONTOFORMULAD = (Ad/MC) V ((K/Ka)-1)

CALCULO DE AMORTIZACIONESFORMULAA= (Ad/MC) V

Pag 9

CLCULO DE REINTEGROS - DEDUCCION DEL MONTO - AMORTIZACIONESR = 14 230.21 x (0.997 - 1) R = - 42.69D = (7,233.49/36,167.47) x 14 230.21 x ((0.997/0.991) - 1)D = 17.23A = 2 846.04A = (7,233.49/36,167.47) x 14 230.21

resumen-coment1.- Nuestro calendario de obra valorizado ha sido elaborado por nosotros, siendo el plazo de ejecucion de la obra noventa dias laborales (90 dias).6.- Nuestro calendario de obra valorizado ha sido elaborado por nosotros, siendo el plazo de ejecucion de la obra noventa dias laborales (90 dias).

2.- El porcentaje que hemos tomado es de un 20% del monto contratado para el adelanto de la obra.3.- El porcentaje que hemos tomado es de un 20% del monto contratado para el adelanto de la obra.

1.- El avance de obra real es de 6.28% mas que el avance de obra programado, esto significa que nuestra obra respecto al primer mes de ejecucion se encuentra adelantada.

3.- El avance de obra real es de 6.28% mas que el avance de obra programado, esto significa que nuestra obra respecto al primer mes de ejecucion se encuentra adelantada.7.- Hemos considerado nuestro factor relacin un diez porciento mayor del valor referencial (+10%).

4.- Hemos considerado nuestro factor relacin un diez porciento mayor del valor referencial (+10%).5.- En el primer mes se ejecutaron todas las partidas de obras preliminares, obras provisionales, contruccion de cisterna y poza de concreto al 100%.

5.- En el primer mes se ejecutaron todas las partidas de obras preliminares, obras provisionales, contruccion de cisterna y poza de concreto al 100%.

4.- En nuestro primer mes de ejecucion de obra se ha valorizado hasta el 10% de avance de columnas.

6.- En nuestro primer mes de ejecucion de obra se ha valorizado hasta el 10% de avance de columnas.

2.- Nuestro reintegro de nuestra formula polinmica del mes de marzo y abril resultan menor a 1, lo que significa que los precios de nuestros elementos bajaron con respecto al mes de septiembre que es el mes de origen.7.- Nuestro reintegro de nuestra formula polinmica del mes de marzo y abril resultan menor a 1, lo que significa que los precios de nuestros elementos bajaron con respecto al mes de septiembre que es el mes de origen.

8.- Nuestro monto a pagar es de ciento ochenta y cuatro mil novecientos diesciseis con cincuenta y cuatro centesimos ( 184 916.54 soles)

CONCLUSIONES...